← Wszystkie artykuły
4 maja 2022 · Poradnik

Polish government subsidises high power charging stations

Marek Gutt-Mostowy
Marek Gutt-Mostowy
CEO | Founder
Polish landing page about charging station subsidies, showing a WILLBERT charger

Get financing from NFOŚiGW

If you are a midsize company with operations in Poland we can assist you in getting financing for your charging network. Learn more on our dedicated website www.dotacjenaladowarki.pl

‍

Marek Gutt-Mostowy
Marek Gutt-Mostowy
CEO | Founder

Marek Gutt-Mostowy is the CEO at WILLBERT by EUROLOOP, driving customer-centric EV charging solutions for roadside retail environments. Before founding EUROLOOP in 2017, he worked in a high-tech environment at CERN. EUROLOOP emerged as an award-winning spin-off from Elon Musk’s SpaceX Hyperloop Pod Competition, where Marek’s team won the Innovation Award. Under his leadership, The company has evolved into an EV solutions provider, delivering seamless, scalable, and retail-optimized charging infrastructure.

Bądź na bieżąco

Otrzymuj najnowsze informacje o ładowaniu EV, handlu na stacjach i ekosystemie WILLBERT prosto na swoją skrzynkę.

Wiedza o ładowaniu EV i handlu, bez spamu. Możesz zrezygnować w każdej chwili.

Artykuły, które mogą Cię zainteresować

Two WILLBERT Amber II chargers under the headline Standalone Hub, -32% CAPEX
16 kwietnia 2026 · Raport · EN

How the Standalone Hub Architecture Cuts Charging Site CAPEX by 32%

An 8-plug DC site, two architectures: four 400 kW standalone chargers against four Amber II units paired into two S-HUB systems. Same plugs, 40% less installed power and €121,000 lower CAPEX.

Illustration of two low-voltage connections, 120 kVA and 180 kVA, combined by S-HUB into 300 kW for charging
19 grudnia 2025 · Analiza · EN

When Low Voltage Delivers High Power

The grid connection decides what a charging site can do. S-HUB combines two independent low-voltage connections on the DC side, so sites without medium-voltage access can still deliver high-power charging.

Two WILLBERT Amber II chargers forming an S-HUB at the Pevna Energy site in Skawina, Poland
20 stycznia 2026 · Studium przypadku · EN

Polish Debut of the S-HUB in Skawina

Poland's first S-HUB is live in Skawina. Operated by Pevna Energy, it runs on two separate low-voltage grid connections and can scale from 200 kW to 720 kW without major hardware changes.

Twoja droga do ładowania EV zaczyna się od strategii

Nasi doradcy pomogą Ci zaplanować, wdrożyć i skalować ładowanie zintegrowane z handlem

Mikko Summala
MówiUKFinlandSweden
Mikko Summala
Menedżer sprzedaży
Dla klientów w:
Kraje nordyckie,Wielka Brytania
Kontakt przez LinkedIn
Maciej Ochocki
MówiUKPoland
Maciej Ochocki
Menedżer sprzedaży
Dla klientów w:
Europa Środkowo-Wschodnia,Wielka Brytania
Kontakt przez LinkedIn
Karim D'Hondt
MówiBelgiumNetherlandsFrance
Karim D'Hondt
Menedżer sprzedaży
Dla klientów w:
Beneluks,Francja
Kontakt przez LinkedIn

Nie ma Twojego regionu? Skontaktuj się przez formularz kontaktowy.